Attach vent damper cable to cable clamp on boiler left panel and join the Molex connector (see Figures 2.4 & 2.4A). Install flue pipe over top of vent damper and secure to damper housing with sheet metal screws or pop rivets.Condensate return piping should be connected to boiler through a 'Hartford Loop.' Supply outlet must run full size from the boiler to a header at least 24' above top of boiler.Observe the following minimum clearances to combustibles: 18'. Locate boiler so connecting flue pipe between draft hood and chimney is as short as possible. SECTION 2: BOILER INSTALLATION STEP 1: LOCATING/SETTING BOILER Boiler may be installed in an alcove (see dimensions in Fig- ure 2.1).If the boiler is installed in an unconfined space, adequate air will be available via normal infiltration. Provisions for combustion air must be in accordance with the National Fuel Gas Code ANSI Z223.1 - latest edition, as well as all applicable local codes.At time of removal of existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while other.Water Treatment.3 Shipment of Boiler.3 SECTION 2: BOILER INSTALLATION Step 1: Locating/Setting Boiler. Turn on the manual fill valve until you see water discharging from the pipe. Hb Smith G200 Manual Rating: 6,0/10 2462votes
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |